Fast Delivery of Diesel Generator Sets

Downtime projects rarely have the luxury of a long procurement window. This page explains which configurations ship fastest, what affects lead time, and how we prepare orders for prompt dispatch.

Standard configurations ship fastest

Standard configurations typically ship within 15 to 20 working days, with some models quoted at 7 to 15 working days and others at 15 to 25. The spread reflects engine platform, rating and enclosure availability rather than a difference in process.

If speed matters, specifying a standard configuration in a common rating is the single biggest lever you have.

What adds time

Non-standard voltages, custom enclosures, extended fuel tanks, and special control or synchronising requirements all extend the schedule. None of them are unreasonable — they just need to be decided early rather than changed mid-build.

Prepared properly, dispatched properly

Factory acceptance testing is performed and documented before dispatch, and every order is packed for export with lifting and lashing specified. Standard payment terms are 30% T/T deposit with the 70% balance due before shipment.

Frequently asked questions

What is your fastest lead time?

Some standard configurations are quoted at 7 to 15 working days; the typical figure is 15 to 20 working days. Your quotation states the lead time for your exact configuration.

Can I get a faster delivery by changing the specification?

Often yes. Standard voltages, standard enclosures and common ratings ship fastest. Ask us to quote an alternative alongside your preferred build so you can compare.

Is the set tested before it ships?

Yes — factory acceptance testing is performed and documented for every order before dispatch.

What are the payment terms?

30% T/T deposit with the 70% balance due before shipment.

Related pages