Diesel Generator Delivery Information

This page sets out what to expect between order confirmation and arrival: how long standard configurations take to ship, how sets are packed and lifted, which export documents accompany the shipment, and how payment is structured.

Lead times

Standard configurations typically ship within 15 to 20 working days. Actual lead time depends on the model and specification — some ratings and configurations are quoted at 7 to 15 working days and others at 15 to 25, so confirm the figure for your exact unit when you place the order.

Customised builds, non-standard voltages, and special enclosures add time. If your project has a fixed commissioning date, tell us at quotation stage so the schedule is realistic.

Packing, lifting and shipment

Sets are packed for export with lifting and lashing points specified in the shipping documentation. Before dispatch we run factory acceptance testing and record the results, so you have a documented performance baseline before the unit leaves our facility.

Shipping documents accompany every export order. Check them against your import requirements early — documentation mismatches are the most common cause of avoidable delay at destination.

Payment terms

Standard terms are 30% T/T deposit with the 70% balance paid before shipment. Other arrangements can be discussed at quotation stage for established accounts and larger projects.

Frequently asked questions

How long does delivery take?

Standard configurations typically ship within 15 to 20 working days, though some models are quoted at 7 to 15 and others at 15 to 25 working days. Your quotation states the figure for your specific configuration.

What are your payment terms?

Standard terms are 30% T/T deposit with the 70% balance due before shipment.

Is the generator tested before shipment?

Yes. Factory acceptance testing is performed and documented for every order, giving you a performance baseline before dispatch.

Which shipping documents are provided?

Each export order ships with a document set covering packing, lifting and shipment. Review it against your import requirements as early as possible.

Related pages